ASTM D5957 PDF

Buy ASTM D R GUIDE FOR FLOOD TESTING HORIZONTAL WATERPROOFING INSTALLATIONS from SAI Global. note that ASTM D “Flood Testing Horizontal Waterproofing Installations” is the ASTM method from which this. Technical Data Sheet draws. ASTM D() – Standard Guide for Flood Testing Horizontal Waterproofing Installations0 item(s) – $ View Basket Welcom.

Author: Moktilar Net
Country: Cayman Islands
Language: English (Spanish)
Genre: Automotive
Published (Last): 15 July 2013
Pages: 317
PDF File Size: 6.14 Mb
ePub File Size: 13.95 Mb
ISBN: 147-4-30373-428-5
Downloads: 49574
Price: Free* [*Free Regsitration Required]
Uploader: Yosho

Link to Active This link will always route to the current Active version of the standard.

Applies for fully adhered or bonded sheet membranes, liquid or fluid applied membranes or loose laid sheet membranes of waterproofing installed on parking garages and plaza deck types over habitable spaces or on elevated structures. The effects shall be analyzed by a licensed structural engineer prior to placement of additional loads. Testing is performed for a minimum of 24 hours and maximum of 72 hours when rainfall is not forecasted to occur.

Water height is maintained so as not to exceed a minimum level of 2 inches below the edge of flashings. Assurance Testing Inspection Certification. A containment assembly awtm constructed to be nondestructive, non-penetrating of the waterproofing installation and easily removable. Enabling you to d957 and mitigate the dd5957 risk in your operations, supply chains and business processes.

Work Item s – proposed revisions of this standard. Assurance Enabling you to identify and mitigate the asym risk in your operations, supply chains and business processes. Containment assemblies are composed of a sacrificial sheet or a polyethylene sheet adhered to the surface of the waterproofing membrane using a watertight seal duct tape. Auditing Consulting Sourcing Training.

ASTM D5957-98(2013)

Evaluating how your products and services meet and exceed quality, safety, sustainability and performance standards. Inspection Validating the specifications, value and safety of your raw materials, products and assets.

  EMIRATI DIALECT PDF

Lateral loads will be imposed on curbs or walls used for containment of the water during the test procedures and their effect should be accounted for. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

Through our network of over 43, people in 1, laboratories and offices in countries, Dd5957 provides quality and safety solutions to a wide range of industries around the world.

If a protection layer is required for flood tested, the recommended practice is that a temporary protection layer be loose laid and removed prior to testing of the waterproofing system. Following the completion of the repairs and curing of materials, the area is retested under the same conditions as the initial flood test. Test area is flooded with water to achieve a minimum cover of 1 inch but not exceed a maximum depth of 4 inches at the lowest point.

Note 2 — Increasing the amount of water forming a hydrostatic head beyond mm 4 in. Validating the specifications, value and safety of your raw materials, products and assets.

Waterproofing membrane and flashings should be inspected and deficiencies repaired. Historical Version s – view previous versions of standard. Ponded water d59577 freeze and become adhered to the waterproofing system resulting in pulling or tearing of the flashings away from the substrate or may break interior corners.

Standard Guide for Flood Testing Horizontal Waterproofing Installations

If leakage is detected during the test period, water is immediately drained from the test area. See also ACI Whether your business is local or global, we can ensure your products meet quality, health, environmental, safety, and social accountability standards for virtually any market around the world. If the product does not meet the performance criteria, additional remediation may be required to pass. The effects of equipment, planters, or other movable objects present within the test area should be considered.

  BEESON AND BISLEY ISSUES IN 21ST CENTURY WORLD POLITICS PDF

Flood testing is considered to be completed if no leaks are identified to have occurred during the test period and the membrane and flashings are intact. Need help or have a question? The values given in parentheses d5597 for information only.

ASTM D – 98 Standard Guide for Flood Testing Horizontal Waterproofing Installations

D Terminology Relating to Roofing and Waterproofing. Formally confirming astmm your products and services meet all trusted external and internal standards. This standard is not intended for use on building roofing systems. Critical locations shall be monitored during the duration of the test period.

ASTM D – 98() Standard Guide for Flood Testing Horizontal Waterproofing Installations

Overflows are provided in the containment assemblies, when needed, at 5 inches above low point on the test surface so as not to exceed the structural capacity of the substrate. Global Reach Intertek is the industry leader with over 42, people in 1, locations in over countries.

Testing should occur prior to the installation of drainage layer, protection layer, pavers or overburden. Applicable waterproofing membrane installations that may be tested using this guide are fully adhered or bonded sheet membranes, liquid or fluid applied membranes, or loose laid sheet membranes. Testing Evaluating how your products and services meet and exceed quality, safety, sustainability and performance standards.

Referenced Documents purchase separately The documents listed below are referenced within the subject standard but are not provided as part of the standard.

Certification Formally confirming that your products and services meet all trusted external and internal standards.

Author: admin